GPS Tracker Magnetic Real-Time Location & Movement Alerts
Free US Shipping
🎃 Spooky Season Sale 🦇
Due to high demand, stock is limited. Get an extra 10% OFF your order with code:
Tap to copy — valid while supplies last
Lost belongings leave you guessing—track them in real time
Locate vehicles and valuables in real time — smartphone location updates, movement alerts, magnetic attachment, no drilling or installation

Why is this tracker perfect for you?
✔ Real-time location updates: Check the location of vehicles, luggage, and other valuables through the smartphone app. Real-time GPS updates help you find tracked belongings when their location matters.
✔ Instant movement alerts: Receive a notification as soon as the tracker detects movement. These alerts can help you respond quickly if a vehicle or other tracked item moves unexpectedly.
✔ Quick magnetic attachment: Attach the tracker to a metal surface in seconds using its strong magnet. No drilling or installation is required, and the built-in audio function adds a way to monitor remotely.

Specifications
Material: ABS plastic
Dimensions: 1.62 in × 0.54 in
Frequency: 850/900/1800/1900 MHz
Operating temperature range: -4°F to 158°F
🎃 Spooky Season Sale 🦇
Due to high demand, stock is limited. Get an extra 10% OFF your order with code:
Tap to copy — valid while supplies last
Free Shipping
Order Processing 1–2 Business Days, Monday through Friday
Estimated Transit 6–9 Business Days, Monday through Friday
Shipping Cost Free within the United States
For more information, click here.
30 Days to Return
Request Period: Within 30 days after delivery.
Contact Email: support@meartom.com
Information Needed: Order number and a brief description of your request.
For more information, click here.